Product Details:
|
|
Place of Origin: | china |
---|---|
Brand Name: | alphaclean |
Certification: | ce |
Model Number: | ISO clean room |
Payment & Shipping Terms:
|
|
Minimum Order Quantity: | 1 set |
Price: | negotiation |
Packaging Details: | Polywood packing |
Delivery Time: | 20 days |
Payment Terms: | L/C, T/T, Western Union |
Detail Information |
|||
Clean Room Class: | ISO 5 - 8 | Airflow: | 2000 - 50000 M3/h |
---|---|---|---|
Core Components: | PLC ,Engine, Motor | Air To Air Heat Recovery Device: | Sensible / Enthaply Heat Wheel |
Fan Type: | Direct Driven / Belt Driven / AC / EC Plug Fan | Service: | Field Installation , Commissioning And Training,engineer Are Able To Service Machinery Overseas |
Document: | Verification And Certification | Leading Time: | 1 - 4 Months |
Highlight: | HVAC Pharma ISO Clean Rooms,AHU ISO Clean Rooms,AHU Dust Free Workshop |
Product Description
HVAC Pharma ISO Clean Rooms
Class 10 Dust-Free Clean Room Workshop
The Class level 10 clean room dust-free workshop standard is based on "the number of dust particles with a diameter greater than or equal to 0.5um per cubic meter of air" as a measure of the cleanliness of the device. "Ten-level dust-free workshop" means that the number of dust particles with a diameter greater than or equal to 0.5um in each cubic of air is less than 10.
HVAC System for china modular clean room turnkey for pharmaceutical factory
HVAC design and room data: according to ISO14644-1 and CFR209E cleanliness class
Chiller system:
- Air cooling chiller
- Water cooling chiller
Air handling unit (AHU)
• Humidifier or dehumidifier
• Air supply ducts
• HEPA filter box
• Air return and air exhaust ducts
• Diffuser, grills , valves, damper and louver, fan etc
The c project is mainly composed of the following systems:
air filtration system, environmental monitoring system, fire alarm system, people flow system, process piping system, power system, lighting system, maintenance structure and electrostatic ground treatment systems. The air-conditioning purification system project includes the entire equipment, equipment matching and construction installation.
Enter Your Message