Product Details:
|
|
Place of Origin: | china |
---|---|
Brand Name: | alphaclean |
Certification: | ce |
Model Number: | ISO clean room |
Payment & Shipping Terms:
|
|
Minimum Order Quantity: | 1 set |
Price: | negotiation |
Packaging Details: | Polywood packing |
Delivery Time: | 20 days |
Payment Terms: | L/C, T/T, Western Union |
Detail Information |
|||
Clean Room Level: | ISO 5 - 8 | Details: | Ceiling Panels,laminar Flow Systems,sandwich Panel |
---|---|---|---|
Application: | Pharma,electronics,lab ,food, Hospital | Period: | 1 - 4 Months |
Service: | Field Installation , Commissioning And Training,engineer Are Able To Service Machinery Overseas | Warranty: | 1 Year |
Document: | Verification And Certification | Material: | Sandwich Panel Fire Proof |
Flooring: | PVC Or Epoxy Floor | Name: | Clean Room Project |
Highlight: | Epoxy Floor ISO Clean Rooms,Aseptic ISO 7 Clean Room,Aseptic Class 10000 Clean Room |
Product Description
Aseptic PVC Epoxy Floor ISO Clean Rooms Class 10000 Purification
ISO 7 Class 10000 Clean Room Purification Project Aseptic And Dust-Free Workshop Decoration
The 10,000-class dust-free workshop standard is based on "the number of dust particles with a diameter greater than or equal to 0.5um per cubic meter of air" as a measure of its cleanliness. "Class 10000 dust-free workshop" means that the number of dust particles with a diameter greater than or equal to 0.5um in each cubic of air is less than 10,000.
Class 10,000 clean room has no special requirements for temperature and humidity. It is advisable to wear clean work clothes. The temperature is generally controlled at 20-22°C in winter and 24-26°C in summer, ±2°C. The humidity in the clean room in winter is controlled at 30-50%, and the humidity in the clean room in summer is controlled at 50-70%
The dust-free workshop project is mainly composed of the following systems:
air filtration system, environmental monitoring system, fire alarm system, people flow system, process piping system, power system, lighting system, maintenance structure and electrostatic ground treatment systems. The air-conditioning purification system project includes the entire equipment, equipment matching and construction installation.
Enter Your Message